77d7eb28

5.2.34. Potentiometer of provision of a butterfly valve

Removal

Detachment of the electric socket from a potentiometer
Shooters showed screws of fastening of a potentiometer.

PERFORMANCE ORDER
1. Remove a weight wire from the accumulator.
2. Disconnect the electric socket from a potentiometer (see the drawing).
3. Unscrew two screws and remove a potentiometer.

Installation

PERFORMANCE ORDER
1. Installation is made in the sequence, the return to removal taking into account the next moments:

– you make installation of a potentiometer at completely closed butterfly valve, at the same time check that the shaft of a potentiometer was combined with an axis of a butterfly valve;
– tighten screws of fastening potentsiomt ра the required moment.