77d7eb28

5.2.26. Measuring instrument of mass of a stream of air

Removal

Removal of a sealing ring from the electric socket of the measuring instrument of mass of a stream of air on the DOHC models

PERFORMANCE ORDER
1. Remove a weight wire from the accumulator.
2. Disconnect the electric socket from the measuring instrument of mass of a stream of air. Remove a sealing ring (see the drawing).
3. Weaken collars of fastening of the main air branch pipe from two parties of the measuring instrument of mass of a stream of air, then disconnect branch pipes and take the air stream measuring instrument.

Installation

PERFORMANCE ORDER
1. Installation is made in the sequence, the return to removal. Check a condition of a sealing ring of the electric socket and, if necessary, replace it.