77d7eb28

11.35.2. Gutter

Removal

PERFORMANCE ORDER
1. Remove the glass panel of the hatch.
2. Unscrew two screws, then remove a gutter from a roof aperture.

Installation

PERFORMANCE ORDER
1. At an angle establish a gutter in a roof aperture, moving it against the stop from two parties, at the same time ledges of fastening have to be combined with gutter guides.
2. Screw in screws of fastening of a gutter, then establish and, if necessary, adjust the glass panel of the hatch.