1. Remove from the top part карбюрато ра the air filter or an air chamber. |
2. Note the provision of adjusting tags of a bimetallic casing, and at their absence put tags which need to be used for installation simplification. Unscrew three screws and remove a bimetallic casing. Move a casing aside, at the same time do not deform hoses of supply of cooling liquid and an electrical wiring of a heater of the gate. |
3. Shift the movement lever to the diaphragm block, pressing the adjusting screw before emergence notable сопротив the line and fix the lever in this situation. |
4. Using a shaft of a drill of the corresponding diameter, measure a gap between the lower party of the air gate and a wall of primary camera (see rice. Movement adjustment, Use of a shaft of a drill for check of a gap of movement). The size of a gap has to be equal to the small gap of the gate of movement given in a technical characteristic. |
5. If necessary establish the required gap, rotating the adjusting screw in the corresponding direction. |
6. Shift the movement lever to the diaphragm block against the stop and record it in this situation. |
7. Using a drill shaft, measure a gap between the lower party of the gate and a wall of primary camera. The size of a gap has to correspond to the size of a big gap of the gate of movement in a technical characteristic. |
8. For adjustment of size of a gap rotate the adjusting screw in the corresponding direction. |
9. Connect a bimetallic spring to the gate lever, then establish a casing of a bimetallic spring on a casing of the gate and fix by screws, without tightening them it is final. Combine tags on a casing of a bimetallic spring and a casing of the gate and an okonchatel but tighten fastening screws. |
10. Mount the air camera on the top part of the carburetor. |