4.10. Thermostat
Prevention
At installation of the thermostat it is necessary to use a new sealing ring.
MODELS 1,4 AND 1,6 L, EXCEPT NZ2 C16
Removal
Removal of a casing of the thermostat
Extraction of the thermostat on models of 1,6 l
PERFORMANCE ORDER |
1. Partially merge cooling liquid from the cooling system. |
2. Take off a gear belt and a pulley of the camshaft. |
3. Unscrew two top bolts fixing a back casing of a gear belt to a head of the block of cylinders and the lower right bolt, the fixing casing to the block of cylinders. |
4. Remove a hose from a thermostat casing. |
5. Move a back casing of a gear belt from a head of the block of cylinders for access to two bolts of fastening of a casing of the thermostat. |
6. Unscrew two bolts of fastening of a casing of the thermostat and remove a casing (see rice. Removal of a casing of the thermostat). |
7. Take the thermostat from a head of the block of cylinders, at the same time cooling liquid can follow from the lower branch pipe of a radiator (see rice. Extraction of the thermostat on models of 1,6 l). |
8. Remove a sealing ring from the thermostat. |
9. If necessary check operability of the thermostat. |
|
Installation
PERFORMANCE ORDER |
1. Installation is made in the sequence, the return to removal taking into account the next moments. |
2. Establish a pulley of the camshaft and a gear belt, then otregul to a ruyta a tension of a gear belt. |
3. Fill in cooling liquid in the cooling system. |
|
NZ2 1,8 I C16 MODELS OF 2,0 L
Removal
Removal of a cover of the thermostat together with the thermostat
Removal of a sealing ring from the thermostat on models of 2,0 l
Installation
PERFORMANCE ORDER |
1. Installation is made in the sequence, the return to removal. At installation of the thermostat use a new sealing ring. In conclusion add I cool Shuya liquid in the cooling system. |
|